2019 CIP Water Pipeline Replacement Project

Post

The 2019 CIP Water Pipeline Replacement Project includes the removal of water pipelines that are deteriorated and in need of replacement. This Project will replace approximately 11 miles of water pipeline at various locations throughout the City. Pipelines to be replaced were selected based on maintenance history, inspection records and coordination with planned paving improvements. Currently, the Project is in construction. Construction will complete by May 2020. Following the replacement of the pipelines, streets will be resurfaced by the upcoming PARIS project.