Construction

Citrus Avenue & Orange Avenue Storm Drain Repair
 
This project consists of numerous types of repair within a 700 foot long run of storm drain channel. The types of repair consist of in place spalling repair, cast in place floor repairs, remove and replace portions of the roof of the channel with cast in place slabs and cast in place sidewall repairs.
 
Construction estimate: $148,000.00
 
Expected Completion Date: May 2016 

Warranty

2015 Storm Drain Repair
 
The scope of the project consists removal of existing 12" CMP and installation of 12" CML&C including repairing curb & gutter, replacement of thermo striping, trench backfill and repair per specifications and 0.1 AC overly to the limit shown on the plan. 
 
Cost of Construction: $68,360.00
 
Completion Date: August 2015
 

 

 

 

 

To Search Our Site

Social Media

 

 

City Calendar

City Hall is closed every
other Friday.  Check the
calendar for closed Fridays.

2016 City Hall Calendar

City Hall Hours:
7:30 am to 5:30 pm

Events Calendar

 

Market Night

PARIS

            

Project Information

Upcoming

No upcoming events

Redlands Twitter

Login page here.