Citrus Avenue & Orange Avenue Storm Drain Repair
This project consists of numerous types of repair within a 700 foot long run of storm drain channel. The types of repair consist of in place spalling repair, cast in place floor repairs, remove and replace portions of the roof of the channel with cast in place slabs and cast in place sidewall repairs.
Construction estimate: $148,000.00
Expected Completion Date: May 2016 


2015 Storm Drain Repair
The scope of the project consists removal of existing 12" CMP and installation of 12" CML&C including repairing curb & gutter, replacement of thermo striping, trench backfill and repair per specifications and 0.1 AC overly to the limit shown on the plan. 
Cost of Construction: $68,360.00
Completion Date: August 2015





To Search Our Site

Social Media



City Calendar

City Hall is closed every
other Friday.  Check the
calendar for closed Fridays.

2016 City Hall Calendar

City Hall Hours:
7:30 am to 5:30 pm

Events Calendar


Market Night



Bike Lane Information

Click to view City of Redlands Bike Lane Information


No upcoming events

Redlands Twitter

Login page here.