2015 Storm Drain Repair

The scope of the project consists removal of existing 12" CMP and installation of 12" CML&C including two cleanouts, repairing curb & gutter, replacement of thermo striping, trench backfill and repair per specifications and 0.1 AC overly to the limit shown on the plan. 

Estimated Cost of Construction: $36,000.00

Warranty 

2014 Storm Drain Repair

This project will consist of concrete repair, debris removal, and replacement of corroded storm drain pipe.

This project has two locations: the underground storm drain south of Redlands Boulevard, between Citrus Avenue and Eighth Street, and underground storm drain at the intersection of Highland Ave. and Ramona Dr.

Structural integrity will be regained and the overall functionality of the storm drain system will be improved.

Cost of Construction: $70,250.00

Completion Date: January 2015

 

To Search Our Site

Social Media

 

 

Market Night

PARIS

            

Project Information

City Calendar

City Hall is closed every
other Friday.  Check the
calendar for closed Fridays.

2015 City Hall Calendar

City Hall Hours:
7:30 am to 5:30 pm

Events Calendar

 

Upcoming

No upcoming events

Redlands Twitter

Login page here.